Case Studies

Waitrose
MGD have installed Altro Whiterock and Stainless steel cladding to many Waitrose stores in dining rooms, food preparation areas, bakeries and toilets throughout the UK.
View: Image 1 | Image 2 | Image 3 | Image 4 Image 5 | Image 6 | Image 7

Pret A Manger
Over one hundred Prets have Altro Whiterock fitted by MGD and we are now installing Altro Floors as part of the total package.
View: Image 1 | Image 2 | Image 3 | Image 4 Image 5 | Image 6 | Image 7

Emirates Stadium
Following the successful completion of the catering facilities and food concessions at the City of Manchester stadium MGD were appointed to carry out the Altro Whiterock Installation at Arsenal Football Club's new home the Emirates Stadium with more than thirteen hundred square meters of wall cladding fitted in over twenty different locations throughout the complex during a six month rolling program.
View: Image 1 | Image 2 | Image 3 | Image 4 | Image 5 | Image 6 | Image 7

HCA Hospitals
MGD has fitted Altro Whiterock 'Pastels' wall cladding to operating theatre suites, examination and treatment rooms and welfare facilities as well as complete wards at London Bridge Hospital, The Wellington Hospital, Lister Hospital to name but three.
View: Image 1 | Image 2 | Image 3 | Image 4 Image 5 | Image 6 | Image 7 | Image 8

Brighton and Gunwharf Marinas
The client was looking for a fast track, durable, easy to clean and stylishly attractive finish to fit out the member's shower facilities at these busy marinas. What else but Altro Whiterock Chameleon and who else but MGD to carry out the low profile welded joint finish.
View: Image 1 | Image 2 | Image 3

Westminster Mortuary
With a very tight program MGD undertook the refurbishment of walls, floors and ceilings at the City of Westminster's public mortuary including Altro Whiterock Wall Cladding and Ceilings, AltroGuard and AltroZolatone coatings, Altrocrete Resin Flooring, Altro Designer Safety Flooring and Altro Ethos Smooth Vinyl. The contract include all strip out, preparation, installation, clean down and reinstatement works and was completed on time, in spec and on budget.
View: Image 1 | Image 2 | Image 3 | Image 4 | Image 5 | Image 6
© 2008 MGD Specialist Interior Finishes | Legal